top of page

Production Optimization

 

The first step is the recording of the "actual" state with the so-called value stream mapping (VSM). Our expert draws an exact picture of the product path, starting with order processing between sales and the customer, through work preparation and logistics, into production and along the entire value adding process till shipping dock where the finished product is sent to the customer.


Along the way, we not only get to know the essential departments of the company, we also find the constraints in the company that limit it from having success.

The constraints are not always exclusively in the direct value adding process  in the production, they can already occur before and often show themselves through ingrained thought patterns. (According to the motto: "We have always done it this way, therefore this must be right").

However, the bottlenecks with the greatest and most direct impact on throughput, productivity and quality are usually in production.
In other words, the ones that most significantly affect the company's overall goal of "making money."

In principle, TECOMA International helps to break with old thought patterns, to rethink procedures and to change them according to methodical measures in such a way that they are conducive to the process in the best possible way.

In an absolute hands-on manner we help our customers to solve the bottlenecks in the production by methodical and structured approach after the analysis. We eliminate waste in the process and coordinate the individual process steps in a targeted manner. In this way, enormous increases in throughput and maximum personnel productivity can be achieved.

In many cases, this can be achieved with virtually no significant investment, simply by changing processes, procedures and behaviors.
□around this, the employees in a company are also an essential factor in this change process.
We involve them actively and appreciatively in the change process from the very beginning of the optimization project.

Our guiding principle:
"It is not the strongest or the most intelligent species that survives, but the one that responds best to change".

Charles Darvin

solution-for-cost-reduction.jpg
VSM_2.jpg

Value stream map (VSM)

bottom of page